[ USACE [ USACE Publications ]  [ [ Bottom of Page ]  [ Search ]  [ Help, POC List
colored horizontal rule

Civil Works
Engineer Technical Letters

PUB.NUMBER PAGES CD-ROM PROPONENT TITLE PUB.DATE
TL 1110-1-138 008 CECW-EG Standard Penetration Test 31 Mar 88
TL 1110-1-162
068 CECW Checklist for Hazardous Waste Landfill Cover Design 30 Sep 01
TL 1110-1-183

007 CECW-EP Using Differential GPS Positioning for Elevation Determination 01 Apr 98
TL 1110-1-184 014CECW-EP Use of the U.S. Coast Guard Differenctial Global Positioning System and the Continuously Operating Reference Station System 01 Oct 98
TL 1110-1-185 114CECW-EG Guidelines on Ground Improvement for Structures and Facilities 01 Feb 99
TL 1110-1-189 038CECW-EWS Use of Geogrids in Pavement Construction 14 Feb 03
TL 1110-1-502 016CECW-E Security Planning and Training Requirements for Hazardous Materials Shipments 01 Oct 03
TL 1110-2-231 047 CECW-EH-Y Initial Reservoir Filling Plan 30 Mar 79
TL 1110-2-239 031 CECW-EH-W Nitrogen Supersaturation 15 Sep 78
TL 1110-2-253 020 CECW-EH-W Measurement of Dissolved Gases to Determine the Degree of Nitrogen Supersaturation 26 Sep 80
TL 1110-2-256 045 CECW-ED Sliding Stability for Concrete Structures 24 Jun 81
TL 1110-2-281 004 CECW-EH-W Reservoir Contaminants 17 Jun 83
TL 1110-2-282 007 CECW-EG Rock Mass Classification Data Requirements for Rippability 30 Jun 83
TL 1110-2-286 008 CECW-EG Use of Geotextiles under Riprap 25 Jul 84
TL 1110-2-299 008 CECW-EH-D Overtopping of Flood Control Levees and Floodwalls 22 Aug 86
TL 1110-2-300 008 CECW-EG Characterization and Measurement of Discontinuities in Rock Slopes 31 Oct 83
TL 1110-2-301 015 CECW-EG Interim Procedure for Specifying Earthquake Motions 26 Aug 83
TL 1110-2-307 014 CECW-ED Flotation Stability Criteria for Concrete Hydraulic Structures 20 Aug 87
TL 1110-2-309 021 CECW-EH-W Water and Wastewater Laboratory Inspections 05 Feb 88
TL 1110-2-310 012 CECW-ED Stability Criteria for Existing Concrete Navigation Structures on Rock Foundations 17 Dec 87
TL 1110-2-311 010 CECW-EE Fire Protection - Hydroelectric Power Plants 29 Feb 88
TL 1110-2-317 159 CECW-EE Selecting Reaction-Type Hydraulic Turbines and Pump Turbines and Hydroelectric Generators and Generator-Motors 15 Dec 88
TL 1110-2-325 016 CECW-EH Ice-Influenced Flood Stage Frequency Analysis 31 Jul 91
TL 1110-2-334 009 CECW-EG Design and Construction of Grouted Riprap 21 Aug 92
TL 1110-2-335 016 CECW-EH-W Development of Drought Contingency Plans 01 Apr 93
TL 1110-2-336 032 CECW-EH-W Operation of Reservoir Systems 31 Jul 94
TL 1110-2-343 025 CECW-ED Structural Design Using the Roller-Compacted Concrete (RCC) Construction Process 31 May 93
TL 1110-2-344 022 CECW-ED Fracture Mechanics Analysis of a Gravity Lock Monolith 31 Dec 93
TL 1110-2-347 008 CECW-EH-Y Control Methods for Salinity Intrusion in Well Stratified Estuaries and Waterways 31 May 93
TL 1110-2-352 007 CECW-ED Stability of Gravity Walls, Vertical Shear 31 Mar 94
TL 1110-2-355 043 CECW-ED Structural Analysis and Design of U-Frame Lock Monoliths 31 Dec 93
TL 1110-2-360 003 CECW-EE Brake Wheel Problem on Tainter Gate Hoist Machinery 31 Dec 93
TL 1110-2-362 009CECW-E/
CECW-O
Environmental Engineering Initiatives for Water Management 31 Jul 95
TL 1110-2-363 005 CECW-EH-Y Data Collection for River Ice Forecasting 31 Jan 94
TL 1110-2-365 075CECW-ED Nonlinear Incremental Structural Analysis of MassiveConcrete Structures 31 Aug 94
TL 1110-2-366 002CECW-ED Seismic Design for Civil Works Buildings 31 Aug 94
TL 1110-2-367 106 CECW-EH-Y Interior Flood Hydrology 31 Mar 95
TL 1110-2-530 012 CECW-OD Field Applications of Polyethylene Pipe in Dredging 15 Dec 86
TL 1110-2-533 041 CECW-ED Lifeline Report #1 System at Risk from Earthquakes Hydroelectric Power Plant Facilities 30 Sep 94
TL 1110-2-534 012 CECW-ED Structural Evaluation of Welded Aluminum Guardrail on Civil Works Projects 30 Sep 94
TL 1110-2-536 067 CECW-ED Nonlinear Incremental Structural Analysis of Zintel Canyan Dam 31 Dec 94
TL 1110-2-537 010 CECW-EH Uncertainty Estimates for Nonanalytic Frequency Curves 31 Oct 97
TL 1110-2-540 061 CECW-EH-Y Hydrologic Aspects of Flood Warning - Preparedness Programs 30 Sep 96
TL 1110-2-542 082 CECW-EG Thermal Studies of Mass Concrete Structures 30 May 97
TL 1110-2-544 041 CECW-EG Geotechnical Analysis By The Finite Element Method 31 Jul 95
TL 1110-2-546 002 CECW-EG Provisions to Set Final Level Grade for Projects Formulated Using Risk-Based Analysis 30 Sep 95
TL 1110-2-547 013CECW-EG Introduction to Probability and Reliability Methods for Use in Geotechnical Engineering 30 Sep 95
TL 1110-2-548 065CECW-ED Composite Materials for Civil Engineering Structures 31 Mar 97
TL 1110-2-550 046CECW-EE Reliability Analysis of Hydropower Equipment 30 May 97
TL 1110-2-553 012 CECW-ED Control Stations and Control Systems for Navigation Locks and Dams 30 May 97
TL 1110-2-556
Errata Sheet, No. 1
166 CECW-EG Risk-Based Analysis in Geotechnical Engineering for Support of Planning Studies 28 May 99
TL 1110-2-560 049CECW-EI Reliability Analysis of Navigational Lock and Dam Mechanical and Electrical Equipment 30 Jun 01
TL 1110-2-569 009CECW-EG Engineering and Design - Design Guidance for Levee Underseepage 01 May 05
TL 1110-3-491 048 CECW-ETE Sustainable Design for Military Facilities 01 May 01
TL 1110-3-504
001 CECW Airfields/Heliports Surface Drainage Design 01 Nov 02
TL 1110-8-5 (FR) 004 CECW-EE Hydroelectric Plant Control 26 Jul 91
TL 1110-8-11 (FR) 009CECW-EG Underwater Blast Monitoring 15 Jul 91
TL 1110-8-14(FR) 003CECW-EG Selected USACE References Relating to Hazardous and Toxic Waste Activities 08 Feb 91
TL 1110-9-10 (FR) 131CECW-ED Cathodic Protection System Using Ceramic Anodes 05 Jan 91

For printed copies, click here.

US Army Corps of Engineers Internet Publishing Group:
Point of Contact for this page:
E-mail address: pubs-corps@usace.army.mil

Updated: 05 Feb 04


colored horizontal



rule
[ USACE Home ]  [ USACE Publications ]  [ Engineer Technical Letters ]  [ Top of Page ]  [ Search ]  [ Help, POC List